
Industrial control mainboards
Controller boards with isolated I/O and terminal interfaces.
PCBA manufacturing
Assembly is quoted after the files are reviewed, not before. BOM, Gerber and test scope are checked together so the build plan and the material plan stay aligned.
Each stage has a defined hand-off. If a material risk appears during review, it is raised before the build date is committed.
Gerber, BOM and assembly drawings reviewed before quoting.
Components sourced, or customer-supplied material checked in.
SMT and through-hole assembly against the approved drawing.
Functional test and outgoing inspection before packing.
Typical board types
Board class, quantity and test scope decide the route. These are the categories we quote most often.

Controller boards with isolated I/O and terminal interfaces.

Power stage and control logic assembled as one module.

Analog front ends and data acquisition boards for field signals.
01
BOM, Gerber, quantity and test scope.
02
DFM notes and material risks returned.
03
Kit completed or shortages flagged.
04
Assembly, functional test, inspection.
05
Labelled, packed and shipped.
Consigned and sourced parts are checked against the approved BOM before build.
Assembly parameters and material lots are recorded per order.
Functional test and visual inspection results are shared with the shipment.
If something is missing from the list below, send what you have and we will confirm the rest.